MANUAL USE AND MAINTENANCE VISPA 35 B ED. 02-2007 EN Doc. 10005706
10 PREPARING THE MACHINE 7. FASTENING THE HANDLEBAR For packing purposes the handlebar is supplied folded and must be put into its working posi
11 PREPARING THE MACHINE 10. SOLUTION TANK Check that the plug is properly inserted in its seat (A). Check that the valve is properly engaged (
12 OPERATION 1. PREPARING TO WORK The followings procedures must be done before installing the tanks: 1. Open the two rear hinges on the batter
13 OPERATION 3. FORWARD MOVEMENT Forward movement by these machines is done using the brush. When the brush is slightly inclined it pulls the mac
14 AFTER WORK IS TERMINATED Proceed as follows at the end of the work cycle and before you perform any type of maintenance: 1. Turn off the sol
15 DAILY MAINTENANCE 1. CLEANING THE RECOVERY TANK 1. Grasp the tube at the rear of the ma chine 2. Remove the drain plug and empty the tank
16 DAILY MAINTENANCE 3. REPLACING THE SQUEEGEE RUBBERS Check the condition of the squeegee rubbers. Replace as necessary. To replace the rubber
17 SCHEDULED MAINTENANCE 1. CLEANING THE SQUEEGEE TUBE Check the squeegee tube for clogging if the suction is insufficient or at periodic inter
18 CHECKING OPERATION 1. ELECTRIC SYSTEM SAFETY The machine has two amperometric safety switches installed in the electric system (below the so
19 BRUSH SELECTION AND USE POLYPROPYLENE BRUSHES (PPL) These are used on all types of floors and offer goods resistance to wear and to hot water
The contained descriptions in the present publication are not binding. The company therefore reserves itself the right to bring in whatever moment po
20 EC DECLARATION OF CONFORMITY The undersigned firm: COMAC S.p.A. Via Cà Nova Zampieri 5 37057 San Giovanni Lupatoto - Verona (VR) - ITALY decla
3 TABLE OF CONTENTS RECEIVING THE MACHINE...
4 Receiving the machine Immediately check, when receiving the machine, that all the materials indicated on delivery documents have been received
5 TECHNICAL DESCRIPTION UM Vispa 35B Rated power W 500 Working width mm 350 Rear squeegee width mm 440 Work capacity m2/h 1050 Water consumpt
6 SYMBOLS USED ON THE MACHINE Cock symbol Used to indicate the solenoid valve switch Brush symbol Used to indicate the brush motor switch
7 GENERAL SAFETY REGULATIONS Follow these regulations carefully to avoid harm to the operator and damage to the machine. Read the labels on the
8 PREPARING THE MACHINE 1. HANDLING THE PACKAGED MACHINE The machine is contained in specific packing. Each pallet contains four machines place
9 PREPARING THE MACHINE 4. CONNECTOR CONNECTON 6. Connect the battery connector to the machine connector 7. Re-assemble everything ATTENTI